[English Version] Solution 1:

You can say that two more holes to divide the pressure by 3, but this only increases by three times the time for the oil lift the dome, there is a weight limit at the dome will not be raised, the problem is that nobody knows how to calculate this limit, well, one solution is to make a pipe connecting the dome draining the oil, so the pressure inside the dome is constant and it is not erected.

I think the big problem is to have precision to deposit 5 thousand feet depth a lot of weight hitting the weight limit for the dome stand still without a drain, there are ocean currents. Who guarantees that oil will not seep between the grains of sand and start to leak? So I believe that the solution of tube (pipe of oil output) is more appropriate. If so, you need to pump oil out of the dome, to avoid that it enters the sand, causing erosion.

[Portuguese Version] Solução 1:

Pode dizer que 2 perfurações a mais divide a pressão por 3, mas isso só aumenta em 3 vezes o tempo para que o petróleo erga a cúpula, existe um peso limite em que a cúpula não será erguida, o problema é que ninguém sabe como calcular esse limite, bom, uma solução é fazer um cano se conectar na cupula drenando o petróleo, assim, a pressão dentro da cúpula fica constante e ela não é erguida.

Acho que o grande problema é ter precisão para depositar a 5 mil pés de profundidade uma grande quantidade de peso atingindo o peso limite para a cupula permanecer imóvel sem um dreno, existe corrente marítima, etc... Quem garante que o petróleo não vai se infiltrar entre os grãos de areia e começar a vazar ? Por isso, acredito que a solução do dreno (cano de saída do petróleo) é a mais adequada. Se for o caso, será preciso bombear o petróleo para fora da cúpula, para evitar que o petróleo entre na areia, causando erosão.




Solution 2:

Leaving the dome with holes, the pressure inside and outside of the structure are equal. Because the density of oil, there will be a force pushing water into the cone increases the velocity of drainage of oil, it is necessary to pump oil on the surface of the sea.

[Portuguese Version]Solução 2:

Deixando a cúpula com buracos, a pressão interna e externa da estrutura são iguais. Devido a densidade do oleo , haverá uma força empurrando agua para dentro dos cones aumentando a velocidade de drenagem of oleo, é necessário bombear o oleo na superficie do mar.